Parker Design Group Icon

A Better Experience

Stormwater Management

Parker Design Group provides stormwater construction documentation and inspections to keep your project compliant and our waterways clean.

Stormwater Management for Better Compliance

Our Stormwater Team will ensure your construction site meets all state and local stormwater regulations from the start, helping you avoid expensive fixes down the road. Our experienced team will make certain your SWPPP meets permit requirements and is updated throughout the project. Contractors and subcontractors are briefed on stormwater guidelines, holding all personnel accountable for the site’s compliance, thereby preventing costly corrective actions.

We keep your job site working. Throughout the life of the project, we will perform inspections to identify any items that are out of compliance so that they can be addressed quickly. Inspection results include photos of any discrepancies which are distributed electronically to the project team to make everyone aware of the necessary improvements.

Our thorough involvement and oversight allow contractors to address any maintenance items before they are identified by local regulators, preventing potential project delays. When the project is complete, the Parker Design Group team will assist in closing out permits, avoiding costly renewal fees and providing you and your contractor the peace of mind to focus on your next project.

Decorative IconA Better Experience

Stormwater Management Services

Department of Environmental Quality (DEQ) Certifications

  • Stormwater Plan Reviewer

  • Stormwater Inspector

  • Stormwater Program Administrator

  • Erosion & Sediment Control Plan Reviewer

  • Erosion & Sediment Control Inspector

  • Erosion & Sediment Control Program Administrator

Filter by:

Store Ease Self Storage

Client: Ziff Real Estate Partners

Location: 2743 Franklin Road, Roanoke, VA

Details:

Parker Design Group worked with Ziff Real Estate Partners on this building conversion project. The plan consisted of converting an existing car dealership building to a self storage facility and constructing a new 14,500 sf pre-fabricated metal building on a portion of the site. A special use permit was required by Roanoke City for this particular project. The finished product included 547…
Learn More

Project Facts:

  • This building includes interior access to all units
  • One hurdle was converting an existing building into a retail space
  • Store Ease contains 547 total storage units

Member One Federal Credit Union

Client: Interactive Design Group

Location: Roanoke, Vinton, & Christiansburg, VA

Details:

Parker Design Group has designed comprehensive site plans for various Member One Federal Credit Union locations including Roanoke, Vinton and Christiansburg. The site plans included a demolition plan, VDOT entrance, traffic flow for an ATM and previous pavers in the parking lot. The sites were approximately 3,000 sq ft in size and included on-site parking and drive through facilities, except for…
Learn More

Project Facts:

  • We have worked on multiple Member One locations
  • Interactive Design Group, the architecture firm involved, has been a client since 2005
  • We did work for the corporate headquarters

Home2Suites

Client: NDRA II, LLC

Location: Roanoke, Blacksburg, & Lynchburg, VA

Details:

Parker Design Group partnered with NDRA II, LLC, a developer of hotel sites, to provide engineering, surveying and stormwater services on various Home2Suites projects in Roanoke, Blacksburg and Lynchburg, VA. The project on Valley View Boulevard in Roanoke City included a demolition of an existing elementary school to provide room for the hotel and parking, as well as an adjacent restaurant….
Learn More

Project Facts:

  • This project included the demolition of a former elementary school
  • We’ve worked with Home2Suits on various locations across VA
  • We provided Stormwater Pollution Prevention Plan (SWPPP) Inspections for various locations

Lowes Distribution Center

Client: Samet

Location: Technology Drive, Roanoke County, VA

Details:

Tilt-up concrete gets its name from the manner in which construction occurs: by lifting or tilting panels of concrete with a crane to form walls of buildings. That was the process used to construct the new Lowes Distribution Center located in the industrial park in Salem, VA. Parker Design Group was contracted by Samet to provide engineering, surveying and stormwater services. The project…
Learn More

Project Facts:

  • A process called concrete tilt-up construction was used
  • We worked within a very short timeframe to design and build this project
  • The project called for truck and fleet vehicle parking

Koppers Storage Yard Expansion

Client: Koppers Inc.

Location: 4020 Koppers Road, Salem, VA

Details:

Koppers is an industrial processing plant on 100 acres of land located adjacent to the Roanoke River in Salem, Virginia. They primarily focus on treating railroad ties and utility poles with products to increase their durability. Due to new regulations, they needed to expand their facility and Parker Design Group was contacted. During preliminary site investigation, it was discovered that they…
Learn More

Project Facts:

  • The expansion took place in an active industrial site
  • The entire site for this project was in a flood plain
  • We implemented a geogrid instead of undercutting the soil
Sorry No Projects Match Your Filters

Commit to connections.

I want to thank you for allowing us the privilege of having Maggie as part of our team for the past few months. She has been nothing but an asset while on the project. Additionally, she is very communicative which is extremely helpful from a project management standpoint.

Cody Bain, CCM – MBPCE