Parker Design Group was contacted by English Construction to perform inspections of storm and sanitary sewers. We took the unique approach of utilizing Closed Circuit Television (CCTV) inspections to ensure compliance and acceptance for this project by VDOT and Campbell County.

Our utilities team was successful in handling the inspections with the utmost attention to detail and met the needs of all involved.

Facts:
  • PDG televised after storm drain installation, to submit for acceptance by VDOT.
  • PDG televised the main storm drains with our crawler camera and used our push camera to inspect the under drain.
Pipeline inspection CCTV new sanitary sewer